Arco Norte Electrical Interconnection Study - Component II: Pre-Feasibility Study

Peer Reviewed icon Peer Reviewed
Author
Date issued
July 2017
Subject
Energy Distribution;
Regional Energy Integration;
Electric Transmission Line
JEL code
O54 - Latin America • Caribbean;
Q20 - Renewable Resources and Conservation: General;
F15 - Economic Integration;
L94 - Electric Utilities;
Q42 - Alternative Energy Sources
Category
Monographs
The objective of this study is to assess the potential for electrical interconnection of power systems in the Arco Norte region of South America, which consists of the countries of Guyana, Suriname, Brazil (with its northern states of Amapá and Roraima) and French Guiana (an overseas department of France). This report (Component II – Pre-Feasibility Study) summarizes the second part of the Arco Norte study; it builds on the first part (Component I – Baseline Study finalized in July 2016) analyzing in greater detail the best interconnection alternative, and presents a roadmap for its implementation.
Generative AI enabled