View metadata
| dc.title | Why Is the Number of IDB Projects with Extensions beyond 24 Months Increasing?: Should We Be Concerned? |
| dc.contributor.author | Avellán, Leopoldo |
| dc.contributor.author | Goncalves Cavalcanti, Vitor |
| dc.contributor.author | Garberi, Pedro M. |
| dc.contributor.author | Marcano, Luis |
| dc.contributor.author | Montilla, Abraham R. |
| dc.contributor.orgunit | Office of Strategic Planning and Development Effectiveness |
| dc.coverage | Brazil |
| dc.coverage | Colombia |
| dc.coverage | Dominican Republic |
| dc.coverage | Mexico |
| dc.coverage | Peru |
| dc.coverage | Argentina |
| dc.coverage | Uruguay |
| dc.coverage | Trinidad and Tobago |
| dc.coverage | Chile |
| dc.coverage | Jamaica |
| dc.coverage | Bolivia |
| dc.coverage | Guatemala |
| dc.coverage | El Salvador |
| dc.coverage | Guyana |
| dc.coverage | Ecuador |
| dc.coverage | Bahamas |
| dc.coverage | Paraguay |
| dc.coverage | Barbados |
| dc.coverage | Suriname |
| dc.coverage | Honduras |
| dc.coverage | Nicaragua |
| dc.coverage | Costa Rica |
| dc.coverage | Venezuela |
| dc.coverage | Panama |
| dc.coverage | Belize |
| dc.coverage | Haiti |
| dc.date.available | 2018-09-14T00:00:00 |
| dc.date.issue | 2018-08-31T00:00:00 |
| dc.description.abstract | The stock of IDB-supported projects with extensions longer than 24 months is increasing. This is creating concerns about mounting costs for both the Bank and the borrower country as well as unnecessary risks to achievement of the project objectives. The model was able to correctly classify 67 percent of a sample of 418 completed investment projects between 2010 and 2017 as being with or without extensions. |
| dc.format.extent | 28 |
| dc.identifier.doi | http://dx.doi.org/10.18235/0001317 |
| dc.identifier.url | https://publications.iadb.org/publications/english/document/Why-Is-the-Number-of-IDB-Projects-with-Extensions-beyond-24-Months-Increasing-Should-We-Be-Concerned.pdf |
| dc.language.iso | en |
| dc.medium | Adobe PDF |
| dc.publisher | Inter-American Development Bank |
| dc.subject | Investment Project |
| dc.subject | Project Cost Estimation |
| dc.subject | Project Cost Overrun |
| dc.subject.jelcode | C20 - Single Equation Models • Single Variables: General |
| dc.subject.jelcode | C50 - Econometric Modeling: General |
| dc.subject.jelcode | O22 - Project Analysis |
| dc.subject.keywords | Microeconometrics;Project Analysis;Goodness of Fit |
| dc.type | Technical Notes |
| idb.identifier.pubnumber | Technical Notes |
| idb.operation | BK-C2020 |