Dec 2019
Author(s): Avellán, Leopoldo; Goncalves Cavalcanti, Vitor; Leal Calderon, Zulima; Lotti, Giulia
This paper assesses the link between the effort to prepare investment projects and the effort to implement them. Effort is measured as the total number of staff hours devoted to the project…
Sep 2019
Author(s): Novella, Rafael; Valencia, Horacio
Information asymmetries and limited skills are two main factors affecting jobseekers’ chances to access quality jobs in developing countries. This paper evaluates the effectiveness of a job…
Jul 2019
Author(s): Avellán, Leopoldo; Leon-Diaz, John
The study finds that variability in the approval rate of IDB-funded investment projects depends more on specific project characteristics than on macroeconomic conditions faced by countries or errors…
Jul 2019
Author(s): Avellán, Leopoldo; Goncalves Cavalcanti, Vitor; Lotti, Giulia
This study assesses whether, by decreasing project preparation time, execution times are lengthened. This study finds no systematic evidence that links project preparation time with project execution…
Jul 2018
Author(s): Urquidi, Manuel; Valencia, Horacio; Foronda, Carlos; Chumacero, Mauricio; Bagolle, Alexandre
El presente documento presenta información de demanda y oferta laboral en las tres áreas metropolitanas del eje de Bolivia. La información de demanda laboral proviene de dos encuestas relevadas a…
Jul 2018
Author(s): Urquidi, Manuel; Valencia, Horacio; Bagolle, Alexandre; Chumacero, Mauricio; Foronda, Carlos
Se presenta el conjunto de datos con información de demanda y oferta laboral en las tres áreas metropolitanas del eje de Bolivia. La información de demanda laboral proviene de dos encuestas relevadas…