Dec 2019
Author(s): Avellán, Leopoldo; Goncalves Cavalcanti, Vitor; Leal Calderon, Zulima; Lotti, Giulia
This paper assesses the link between the effort to prepare investment projects and the effort to implement them. Effort is measured as the total number of staff hours devoted to the project…
Jul 2019
Author(s): Avellán, Leopoldo; Leon-Diaz, John
The study finds that variability in the approval rate of IDB-funded investment projects depends more on specific project characteristics than on macroeconomic conditions faced by countries or errors…
Jul 2019
Author(s): Avellán, Leopoldo; Goncalves Cavalcanti, Vitor; Lotti, Giulia
This study assesses whether, by decreasing project preparation time, execution times are lengthened. This study finds no systematic evidence that links project preparation time with project execution…
Feb 2019
Author(s): Bagolle, Alexandre; Valencia, Horacio; Urquidi, Manuel
A pesar de los avances en cuanto al nivel de cobertura escolar y educación de la mano de obra en Bolivia, los trabajadores siguen teniendo bajos niveles de habilidades y las empresas siguen teniendo…
Oct 2014
Author(s): Sánchez, Mario; Biehl, María Loreto; Sabra, Mariel; Fazio, Maria Victoria; Moreno, María Verónica; Arroyo, Daniel; Posada, Carolina
Los grupos consultivos (ConSOC) son la plataforma del BID para promover el intercambio de información, fortalecer el diálogo y la consulta recurrente con organizaciones de la sociedad civil (OSC) en…