Dec 2019
Author(s): Avellán, Leopoldo; Goncalves Cavalcanti, Vitor; Leal Calderon, Zulima; Lotti, Giulia
This paper assesses the link between the effort to prepare investment projects and the effort to implement them. Effort is measured as the total number of staff hours devoted to the project…
Jul 2019
Author(s): Avellán, Leopoldo; Leon-Diaz, John
The study finds that variability in the approval rate of IDB-funded investment projects depends more on specific project characteristics than on macroeconomic conditions faced by countries or errors…
Jul 2019
Author(s): Avellán, Leopoldo; Goncalves Cavalcanti, Vitor; Lotti, Giulia
This study assesses whether, by decreasing project preparation time, execution times are lengthened. This study finds no systematic evidence that links project preparation time with project execution…
Apr 2019
Author(s): Ayres, João; García, Marcio; Guillen, Diogo; Kehoe, Patrick
Brazil has had a long period of high inflation. It peaked around 100 percent per year in 1964, decreased until the first oil shock (1973), but accelerated again afterward, reaching levels above 100…
Dec 2016
Author(s): Andrian, Leandro Gaston; Avellán, Leopoldo
El producto potencial y la brecha del producto son conceptos comúnmente utilizados para informar el ejercicio de las políticas monetaria y fiscal, así como para el análisis del desempeño del sistema…
Dec 2004
Author(s): Moccero, Diego; Winograd, Carlos
This paper was prepared within the framework of "Deeper Integration of MERCOSUR: Dealing with Disparities", a joint initiative between the Integration and Regional Programs Department and…