Dec 2019
Author(s): Avellán, Leopoldo; Goncalves Cavalcanti, Vitor; Leal Calderon, Zulima; Lotti, Giulia
This paper assesses the link between the effort to prepare investment projects and the effort to implement them. Effort is measured as the total number of staff hours devoted to the project…
Jul 2019
Author(s): Avellán, Leopoldo; Leon-Diaz, John
The study finds that variability in the approval rate of IDB-funded investment projects depends more on specific project characteristics than on macroeconomic conditions faced by countries or errors…
Jul 2019
Author(s): Avellán, Leopoldo; Goncalves Cavalcanti, Vitor; Lotti, Giulia
This study assesses whether, by decreasing project preparation time, execution times are lengthened. This study finds no systematic evidence that links project preparation time with project execution…
Mar 2018
Author(s): Serebrisky, Tomás; Watkins, Graham George; Ramirez, Maria Cecilia; Meller, Hendrik; Frisari, Giovanni Leo; Melo, Rahissa; Georgoulias, Andreas
This paper introduces a framework of sustainability criteria that covers an integrated spectrum of economic, financial, environmental, social, and institutional dimensions for infrastructure projects…
Sep 2017
Author(s): Watkins, Graham George; Mueller, Sven-Uwe; Meller, Hendrik; Ramirez, Maria Cecilia; Serebrisky, Tomás; Georgoulias, Andreas
This report investigates the nature and consequences of conflict in infrastructure projects in Latin America and the Caribbean (LAC). To the best of the authors’ knowledge, this is the first study on…
Sep 2017
Author(s): Watkins, Graham George; Mueller, Sven-Uwe; Meller, Hendrik; Ramirez, Maria Cecilia; Serebrisky, Tomás; Georgoulias, Andreas
Este informe investiga la naturaleza y las consecuencias de los conflictos en los proyectos de infraestructura en América Latina y el Caribe (ALC). Hasta donde los autores tienen conocimiento, este…
Feb 2016
Author(s): García Moreno, Mauricio; Kaufmann, Jorge; Martínez Guzman, Juan Pablo; Sanginés, Mario
Conocer cómo se están desarrollando los sistemas de gestión pública para lograr mayor efectividad en la actuación de las administraciones públicas, es un interés presente en los países en desarrollo…
Jun 2015
Author(s): Cuesta, Juan Pablo; García Moreno, Mauricio; Kaufmann, Jorge; Pallavicini, Violeta; Sanginés, Mario
This document presents the executive summary of the "National Progress Report (2007¿2013) on Institutional Capacity to Implement Managing for Development Results" in Trinidad and Tobago. It…
Jun 2015
Author(s): Cuesta, Juan Pablo; García Moreno, Mauricio; Kaufmann, Jorge; Pallavicini, Violeta; Sanginés, Mario
Este documento presenta el resumen ejecutivo del Informe nacional de avance 2007-2013 sobre la capacidad institucional para implementar la gestión para resultados en el desarrollo en Trinidad y…
Jun 2015
Author(s): Cuesta, Juan Pablo; García Moreno, Mauricio; Kaufmann, Jorge; Pallavicini, Violeta; Sanginés, Mario
This document presents the executive summary of the "National Progress Report (2007-2013) on Institutional Capacity to Implement Managing for Development Results" in Jamaica. It is based on…
Jun 2015
Author(s): Cuesta, Juan Pablo; García Moreno, Mauricio; Kaufmann, Jorge; Pallavicini, Violeta; Sanginés, Mario
Este documento presenta el resumen ejecutivo del Informe nacional de avance 2007-2013 sobre la capacidad institucional para implementar la gestión para resultados en el desarrollo en Jamaica. Se basa…
Jun 2015
Author(s): Cuesta, Juan Pablo; García Moreno, Mauricio; Kaufmann, Jorge; Pallavicini, Violeta; Sanginés, Mario
This document presents the executive summary of the "National Progress Report (2007-2013) on Institutional Capacity to Implement Managing for Development Results" in Suriname. It is based…
Jun 2015
Author(s): Cuesta, Juan Pablo; García Moreno, Mauricio; Kaufmann, Jorge; Pallavicini, Violeta; Sanginés, Mario
Este documento presenta el resumen ejecutivo del Informe nacional de avance 2007-2013 sobre la capacidad institucional para implementar la gestión para resultados en el desarrollo en Surinam. Se basa…
Jun 2015
Author(s): Cuesta, Juan Pablo; García Moreno, Mauricio; Kaufmann, Jorge; Pallavicini, Violeta; Sanginés, Mario
This document presents the executive summary of the "National Progress Report (2007-2013) on Institutional Capacity to Implement Managing for Development Results" in The Bahamas. It is…
Jun 2015
Author(s): Cuesta, Juan Pablo; García Moreno, Mauricio; Kaufmann, Jorge; Pallavicini, Violeta; Sanginés, Mario
Este documento presenta el resumen ejecutivo del Informe nacional de avance 2007-2013 sobre la capacidad institucional para implementar la gestión para resultados en el desarrollo en las Bahamas. Se…
Jun 2015
Author(s): Cuesta, Juan Pablo; García Moreno, Mauricio; Kaufmann, Jorge; Pallavicini, Violeta; Sanginés, Mario
This document presents the executive summary of the "National Progress Report (2007-2013) on Institutional Capacity to Implement Managing for Development Results" in Barbados. It is based…
Jun 2015
Author(s): Cuesta, Juan Pablo; García Moreno, Mauricio; Kaufmann, Jorge; Pallavicini, Violeta; Sanginés, Mario
Este documento presenta el resumen ejecutivo del Informe nacional de avance 2007-2013 sobre la capacidad institucional para implementar la gestión para resultados en el desarrollo en Barbados. Se…
Jun 2015
Author(s): Cuesta, Juan Pablo; García Moreno, Mauricio; Kaufmann, Jorge; Pallavicini, Violeta; Sanginés, Mario
This document presents the executive summary of the "National Progress Report (2007-2013) on Institutional Capacity to Implement Managing for Development Results" in Belize. It is based on…
Jun 2015
Author(s): Cuesta, Juan Pablo; García Moreno, Mauricio; Kaufmann, Jorge; Pallavicini, Violeta; Sanginés, Mario
Este documento presenta el resumen ejecutivo del Informe nacional de avance 2007-2013 sobre la capacidad institucional para implementar la gestión para resultados en el desarrollo en Belice. Se basa…
Jun 2015
Author(s): Cuesta, Juan Pablo; García Moreno, Mauricio; Kaufmann, Jorge; Pallavicini, Violeta; Sanginés, Mario
This document presents the executive summary of the "National Progress Report (2007-2013) on Institutional Capacity to Implement Managing for Development Results" in Guyana. It is based on…