Dec 2019
Author(s): Avellán, Leopoldo; Goncalves Cavalcanti, Vitor; Leal Calderon, Zulima; Lotti, Giulia
This paper assesses the link between the effort to prepare investment projects and the effort to implement them. Effort is measured as the total number of staff hours devoted to the project…
Jul 2019
Author(s): Avellán, Leopoldo; Leon-Diaz, John
The study finds that variability in the approval rate of IDB-funded investment projects depends more on specific project characteristics than on macroeconomic conditions faced by countries or errors…
Jul 2019
Author(s): Avellán, Leopoldo; Goncalves Cavalcanti, Vitor; Lotti, Giulia
This study assesses whether, by decreasing project preparation time, execution times are lengthened. This study finds no systematic evidence that links project preparation time with project execution…
Feb 2019
Author(s): Bagolle, Alexandre; Valencia, Horacio; Urquidi, Manuel
A pesar de los avances en cuanto al nivel de cobertura escolar y educación de la mano de obra en Bolivia, los trabajadores siguen teniendo bajos niveles de habilidades y las empresas siguen teniendo…
Aug 2007
Author(s): Pires, Jose Claudio Linhares; Aquino, Sixto
This document evaluates the first exercise of the Expanded Project Supervision Reports (XPSR) elaborated by PRI in 2006. The XPSR exercise was done in order to comply with the Good Practice Standards…
Aug 2007
Author(s): Pires, Jose Claudio Linhares; Aquino, Sixto
En el presente documento se evalúa el primer ejercicio de informes ampliados de supervisión de proyectos llevado a cabo por PRI en 2006. Dicho ejercicio se realizó con el fin de dar cumplimiento a…