Dec 2019
Author(s): Avellán, Leopoldo; Goncalves Cavalcanti, Vitor; Leal Calderon, Zulima; Lotti, Giulia
This paper assesses the link between the effort to prepare investment projects and the effort to implement them. Effort is measured as the total number of staff hours devoted to the project…
Jul 2019
Author(s): Avellán, Leopoldo; Leon-Diaz, John
The study finds that variability in the approval rate of IDB-funded investment projects depends more on specific project characteristics than on macroeconomic conditions faced by countries or errors…
Jul 2019
Author(s): Avellán, Leopoldo; Goncalves Cavalcanti, Vitor; Lotti, Giulia
This study assesses whether, by decreasing project preparation time, execution times are lengthened. This study finds no systematic evidence that links project preparation time with project execution…
Dec 2016
Author(s): Andrian, Leandro Gaston; Avellán, Leopoldo
El producto potencial y la brecha del producto son conceptos comúnmente utilizados para informar el ejercicio de las políticas monetaria y fiscal, así como para el análisis del desempeño del sistema…
Aug 2010
Author(s): Giordano, Paolo; Watanuki, Masakazu; Durán Lima, José; Ludeña, Carlos E.; Alvarez, Mariano; de Miguel, Carlos; Wong, Sara; Arguello, Ricardo; Terra, María Inés; Bucheli, Marisa; Laens, Silvia; Estrades, Carmen; Chisari, Omar O.; Maquieyra, Javier; Romero, Carlos; Ferreira Filho, Joaquim Bento de Souza; Medvedev, Denis; van der Mensbrugghe, Dominique; Tourinho, Octávio Augusto Fontes; Kume, Honorio; Pedroso, Ana Cristina de Souza
This book contains a selection of studies discussed at the first and second Regional Meetings on Computable General Equilibrium, which were held, respectively, in Santiago, Chile on 13 and 14 April…