Feb 2019
Author(s): Banerjee, Abhijit; Breza, Emily; Townsend, Robert; Vera-Cossio, Diego A.
Approaches to underdevelopment based on misallocation of resources have two premises. First, that there is huge heterogeneity in terms of underlying productivity among potential and actual…
Mar 2014
Author(s): Stone, Leslie F.; Fryer, Michelle; Conroy, Hector; Scholl, Lynn; Marto, Ricardo; Sadeghi, Patricia; Di Tata, Juan Carlos
La presente evaluación es la tercera evaluación independiente del Banco Interamericano de Desarrollo (BID) del Programa de País con Barbados. La evaluación abarca el período que media entre diciembre…
Oct 2011
Author(s): Alvarez, Lourdes; Gonzalez Diez, Verónica M.
The objective of this thematic note is to analyze IDB's actions in integrated watershed management during the period 1989-2010. The approach of the IDB's loan portfolio in this sector…
Oct 2011
Author(s): Alvarez, Lourdes; Gonzalez Diez, Verónica M.
El objetivo de esta nota temática es realizar un análisis de la acción del BID en el Manejo Integrado de Cuencas Hídrográficas (MICH) durante el periodo 1989-2010. Hubo un cambio en el enfoque de la…
Mar 2011
Author(s): Gonzalez Diez, Verónica M.
This evaluation conducts an ex post review of the mitigation measures in the Samalayuca II and Monterrey III thermal power generation projects in Mexico. In general, it can be concluded that both…
Mar 2011
Author(s): Gonzalez Diez, Verónica M.
Esta evaluación realiza un análisis ex-post de las medidas de mitigación en los proyectos de generación térmica de Samalayuca II y Monterrey III en México. En términos generales se puede concluir que…
Mar 2011
Author(s): Gonzalez Diez, Verónica M.
This evaluation conducted a comprehensive analysis of the long-term socioeconomic impact on the resettled population in the context of the Porce II Hydroelectric Project in Antioquia, Colombia. The…
Mar 2011
Author(s): Gonzalez Diez, Verónica M.
Esta evaluación realizó un análisis integral del impacto socioeconómico de largo plazo sobre el reasentamiento poblacional en el marco del Proyecto Hidroeléctrico Porce II en Antoquia, Colombia. Los…
Feb 2011
Author(s): Gonzalez Diez, Verónica M.
This evaluation helps to address the need in literature on Environmental Impact Assessment during the monitoring of operations and ex post evaluations. It helps to develop innovative methodologies…
Feb 2011
Author(s): Gonzalez Diez, Verónica M.
Esta evaluación contribuye a llenar la necesidad literaria sobre Evaluación de Impacto Ambiental durante el seguimiento de operaciones y evaluaciones ex-post. Ayuda a desarrollar metodologías…